Answer first

Sample first, confirm the spec in writing, then order. Five steps: send your spec, get a sample suit, confirm the spec, production, inspection and shipment. A sample suit costs more than a fabric swatch and takes longer — but it is the only way to check fit, stretch and seams before bulk. Never approve bulk on a drawing alone.

The 5 steps

Step 1 — Send your spec

Send one of these: a physical sample suit, a tech pack, or a drawing with measurements. Include: activity (surf, dive, snorkel, swim, spearfishing); thickness (2, 3/2, 4/3, 5 or 7 mm); neoprene grade (SBR, SCR or CR); lining (nylon, thermal fleece, smooth skin panels); seam (flatlock, GBS, sealed); zip (chest-zip, back-zip, zip-free); sizes and size split; colours and logo; quantity. If you do not know a field, say so — we recommend from the activity and water temperature. See the thickness guide and the seam guide.

Step 2 — Get a sample suit

We make a sample suit to your spec. Check it in three ways: fit on a real body (see the size guide); stretch and recovery by hand; seams inside and outside — a GBS seam shows no stitch holes on the outside, a sealed seam shows a smooth tape line inside. Sample time is typically 5–7 days and depends on the suit — a standard fullsuit sample is faster than a hooded 7 mm back-zip suit or a two-piece spearfishing suit. Sample price is quoted per order.

Step 3 — Confirm the spec in writing

After the sample, we confirm the full spec in writing before bulk: thickness, grade, lining, seam, zip, sizes and size split, colours, logo method and position, packing, and quantity. Any change after this point costs time — make all changes at the sample stage.

Step 4 — Production

Bulk production starts after deposit and written spec confirmation. Bulk lead time is typically 13–14 days and depends on quantity, thickness and season. The minimum order per design is typically 200 pcs. Tell us your delivery date when you order — we confirm whether it is possible before you commit, not after.

Step 5 — Inspection and shipment

Every bulk order is checked before shipment: seams, zips, sizes against the approved sample, logo position, and packing. Export packing is standard; tell us if you need individual polybags, hang tags, or carton marks. Shipment is by sea or air — freight is quoted per order.

SBR vs SCR vs CR — which grade for your suit?

SBRSCRCR
Best wetsuit useWarm-water shorties, rental fleets, price-led suitsAll-round surf, dive, swim, snorkel — the standard choicePremium surf and dive suits sold on quality and long life
Stretch recoveryGood, slowerGood, better than SBRBest, fastest
Weather resistanceFairGoodBest
Price bandLowestMiddleHighest

Full comparison: see decision-tables.md. Neoprene fabric by the metre: fabrics.neoprenecustom.com.

MOQ, sample and lead time — one source of truth

ItemValue
Minimum order per designtypically 200 pcs
Sample timetypically 5–7 days
Sample priceQuoted per order
Bulk lead time after deposit and spec confirmationtypically 13–14 days
Payment termsConfirmed on the quote (deposit percentage and balance terms)
Test reports (RoHS / REACH / OEKO-TEX)Available on request

MOQ, sample time and bulk lead time above are the owner's confirmed standard terms; sample price, payment terms and test-report numbers are still confirmed per order. The figures above are the only place MOQ, sample and lead time are stated — every product page points here.

What to send with your inquiry (checklist)

  • Activity and water temperature your buyers use
  • Thickness and neoprene grade (or "recommend for this water")
  • Seam and zip choice (or "recommend")
  • Lining choice (nylon, thermal fleece, smooth skin panels)
  • Sizes and size split (how many of each size)
  • Colours (numbers from the colour chart) and logo artwork
  • Quantity and delivery date
  • Packing needs (polybag, hang tag, carton marks)

Internal links

Scuba wetsuit 5 mm, back-zip — men

FAQ